View Single Post
Old Aug 18th, 2005, 08:54 PM   #41 (permalink)
Galimba1
Proud owner of a GA16i
 
Galimba1's Avatar
 
Join Date: Aug 2002
Location: San Jose, Ca
Posts: 491
Send a message via AIM to Galimba1
Cut 1 inch above the pivot ball. Then, after you put everything back together, you can move the pivot ball up, increasing the lever arm length. Its necessary to have a welder, unless you just want to hack your shifter. In that case, cut about 1 1/2 to 2 inches off the top.
__________________
B12
Galimba1 is offline   Reply With Quote