|
Of course remove battery, the air box, the axles, the starter, the clutch slave cylinder, the shift rod. Then support the engine and remove the top motor mount on the driver's side and remove the rear lower engine mount.
Remove the trans bolts (note the location as you remove the nine bolts) and pull the trans out.
Check for hot spots and cracking on the flywheel, I recommend resurfacing for light surface problems and replacing it for obvious defects.
When installing, two step the torque of the pressure plate first to 14 ft/lb and then 16-29 ft/lb.
The upper trans to engine 5 bolts should be torqued to 29-36 ft/lb and the lower 4 bolts should be torqued to 22-30 ft/lb.
Troy
__________________
SHIFT_Happiness
1992 S13 240SX SE Fastback KA24DE 5 spd - Type X Aero & Seibon Carbon Hood & Hatch -soon GT28RS
1993 U13 Altima SE KA24DET 5 spd w/ Nismo LSD - A high hp FWD can be fun (GT30R Turbo inside)
1990 Z32 300ZX VG30DETT 5 spd - 600HP & Very Civilized (working on twin GT28RS turbos)
Still trying to import a 1988 R31 Skyline GTS-R w/ RB20DET-R - only 800 produced (legal under show/display regs)
|