View Single Post
Old May 23rd, 2007, 10:02 PM   #6 (permalink)
tknbkthrsdy4anfg
Nissan Enthusiast
 
Join Date: Apr 2007
Location: Napa Valley, CA
Posts: 34
Send a message via AIM to tknbkthrsdy4anfg
Day 5
Wednesday, May 16, 2007
Since I am waiting on some parts today was cleaning day, because a clean engine is a happy engine. I started out by using a special adjustable wrench to turn the crank.

Here you can see pistons 2 & 3 before and after cleaning. All I used was some brake clean and a rag:


Piston number 3 had a minor nick from the rear intake valve,
but doesn’t look like anything bad. Next I cleaned the block, a lot of brake clean and some scrubbing with a rag and a wire brush and it looks pretty good, not perfect but not bad.


It looked like the dipstick leaks from where the dirt was caked on the block. Finally I cleaned the oil pan and painted the motor mounts and some of the pulleys. After 4 cans of brake clean and numerous rags, the engine is starting to come together. I get all the seals and new parts tomorrow.
__________________
Legal JDM
REC Productions
tknbkthrsdy4anfg is offline   Reply With Quote