View Single Post
Old May 23rd, 2007, 10:00 PM   #2 (permalink)
tknbkthrsdy4anfg
Nissan Enthusiast
 
Join Date: Apr 2007
Location: Napa Valley, CA
Posts: 34
Send a message via AIM to tknbkthrsdy4anfg
Day 1
Friday May 11th, 2007
Today I got the 180 clip inside the shop and made myself a little workspace inside our engine dyno room where I could keep everything organized and out of the way. I took a bunch of pictures so I would know where everything goes and started by removing the one remaining fender and front bumper, then the wiring harness, labeling all the connectors as I went so I wouldn’t get confused later on. When I got the harness disconnected I started removing the accessories. First to go was the ABS unit, then the Air Injection Valve (Which I am going to reuse later), power steering, and A/C pump. I called it a day early so I could go hang out with the guys.



Here you can see the labels I put on all the connectors.
__________________
Legal JDM
REC Productions
tknbkthrsdy4anfg is offline   Reply With Quote